Repository navigation
Do small utilities still pre-screen interconnections by gut feel? #438
Unanswered
chenyi6758-source
asked this question in
Q&A
Replies: 0 comments
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
Hi @nlaws-camus — I'm Chen Yi, an energy systems researcher currently turning an open-source hosting-capacity tool into a product practitioners can use. What Camus Energy does for small utilities and co-ops caught my attention — the utilities that can't just buy CYME are exactly who I'm trying to serve.
I'm building pvhostcap, a lightweight hosting-capacity screener (CSV in, max connectable PV plus weak-bus map plus binding constraint out). Before I go further down the wrong path: in your experience with smaller utilities, is the "quick pre-screen before a full interconnection study" still done by gut feel or spreadsheets, or is that step already painless? "Painless" is a perfectly good answer.
— Chen Yi
All reactions