Skip to content

[WIP] NO-JIRA: [TNF] Put target node in standby mode during certificate rollout#30774

Open
clobrano wants to merge 1 commit intoopenshift:mainfrom
clobrano:enhancement/tnf-place-replaced-node-in-standby-for-certificate-restart
Open

[WIP] NO-JIRA: [TNF] Put target node in standby mode during certificate rollout#30774
clobrano wants to merge 1 commit intoopenshift:mainfrom
clobrano:enhancement/tnf-place-replaced-node-in-standby-for-certificate-restart

Conversation

@clobrano
Copy link
Contributor

Put the target node in standby after restoring etcd quorum to
prevent resource agents from starting prematurely. Wait for the
certificate-triggered etcd restart on the surviving node to complete
before removing standby, ensuring proper sequencing during node
replacement recovery.

Put the target node in standby after restoring etcd quorum to
prevent resource agents from starting prematurely. Wait for the
certificate-triggered etcd restart on the surviving node to complete
before removing standby, ensuring proper sequencing during node
replacement recovery.
@openshift-ci-robot
Copy link

Pipeline controller notification
This repo is configured to use the pipeline controller. Second-stage tests will be triggered either automatically or after lgtm label is added, depending on the repository configuration. The pipeline controller will automatically detect which contexts are required and will utilize /test Prow commands to trigger the second stage.

For optional jobs, comment /test ? to see a list of all defined jobs. To trigger manually all jobs from second stage use /pipeline required command.

This repository is configured in: automatic mode

@openshift-ci openshift-ci bot added the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Feb 11, 2026
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Feb 11, 2026

Skipping CI for Draft Pull Request.
If you want CI signal for your change, please convert it to an actual PR.
You can still manually trigger a test run with /test all

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Feb 11, 2026

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by: clobrano
Once this PR has been reviewed and has the lgtm label, please assign qjkee for approval. For more information see the Code Review Process.

The full list of commands accepted by this bot can be found here.

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@clobrano
Copy link
Contributor Author

/payload-job periodic-ci-openshift-release-master-nightly-4.22-e2e-metal-ovn-two-node-fencing-recovery-techpreview

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Feb 11, 2026

@clobrano: trigger 0 job(s) for the /payload-(with-prs|job|aggregate|job-with-prs|aggregate-with-prs) command

@clobrano
Copy link
Contributor Author

/payload-job periodic-ci-openshift-release-master-nightly-4.21-e2e-metal-ovn-two-node-fencing-recovery-techpreview

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Feb 11, 2026

@clobrano: trigger 0 job(s) for the /payload-(with-prs|job|aggregate|job-with-prs|aggregate-with-prs) command

@clobrano
Copy link
Contributor Author

/payload-job periodic-ci-openshift-release-master-nightly-4.22-e2e-metal-ovn-two-node-fencing-recovery-techpreview

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Feb 11, 2026

@clobrano: trigger 0 job(s) for the /payload-(with-prs|job|aggregate|job-with-prs|aggregate-with-prs) command

@clobrano clobrano changed the title [TNF] Put target node in standby mode during certificate rollout [WIP] NO-JIRA: [TNF] Put target node in standby mode during certificate rollout Feb 12, 2026
@openshift-ci-robot openshift-ci-robot added the jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. label Feb 12, 2026
@openshift-ci-robot
Copy link

@clobrano: This pull request explicitly references no jira issue.

Details

In response to this:

Put the target node in standby after restoring etcd quorum to
prevent resource agents from starting prematurely. Wait for the
certificate-triggered etcd restart on the surviving node to complete
before removing standby, ensuring proper sequencing during node
replacement recovery.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@clobrano clobrano marked this pull request as ready for review February 12, 2026 08:37
@clobrano
Copy link
Contributor Author

/payload-job periodic-ci-openshift-release-master-nightly-4.22-e2e-metal-ovn-two-node-fencing-recovery-techpreview

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Feb 12, 2026

@clobrano: trigger 0 job(s) for the /payload-(with-prs|job|aggregate|job-with-prs|aggregate-with-prs) command

@openshift-ci-robot
Copy link

Scheduling required tests:
/test e2e-aws-csi
/test e2e-aws-ovn-fips
/test e2e-aws-ovn-microshift
/test e2e-aws-ovn-microshift-serial
/test e2e-aws-ovn-serial-1of2
/test e2e-aws-ovn-serial-2of2
/test e2e-gcp-csi
/test e2e-gcp-ovn
/test e2e-gcp-ovn-upgrade
/test e2e-metal-ipi-ovn-ipv6
/test e2e-vsphere-ovn
/test e2e-vsphere-ovn-upi

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Feb 12, 2026

@clobrano: The following tests failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
ci/prow/e2e-aws-ovn-serial-1of2 52ab6d6 link true /test e2e-aws-ovn-serial-1of2
ci/prow/e2e-gcp-ovn 52ab6d6 link true /test e2e-gcp-ovn

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants